Monday, August 18, 2014

All the Boring Stuff Before the Good Stuff

When we last left all all the walls were torn out.
When all of that was done, Blake started rebuilding the new wall.
At that moment I realized that I would not make a very good engineer, or builder for that matter. Blake was meticulous about measuring 19 gazillion times and making sure it was level just as many times. If it was me, I would have looked at it..."Yep. Looks about right" and called it good.
It is moments like that that I simultaneously realize, that is why Blake and I are a good team, and why we could never be on the amazing race together.
After the wall was put up and level, we moved on to the open door way.
It stated out looking like this:
We wanted the new door to be more of an opening at the bottom of the stairs to give it better flow, so we got to cutting.
Surprisingly, deciding where to open the wall to, was a lengthy conversation. In the end we decided to open it all the way to the bottom of the stairs. So, just a little bit bigger then this picture.

We also decided, long ago, that we would keep the secret passage way for the kids.
So, in order to make it a little bit nicer looking, Blake framed out the small doorway to the passageway.
This is where a lot of things, that have taken a lot of time, happened.
None of these pictures are all that interesting, unless you are planning on doing the same to your house. However, all of these things took Blake (working on them at nights) a couple days.
First up? HVAC.
On an exciting scale, this would rate very close to snooze-fest.
Blake cut into our HVAC duct. We had bought the corner ducts from Home Depot, and some flexible duct work.
He put the corner duct in then attached the flexible duct.
He secured it to the ceiling using the worlds largest zip ties.
Feeling the air flow through the ducts was very gratifying.
Next on the list was electrical. I would like to say that we did this...but we didn't. We hired a professional to do the job. Our wires were such a cluster-fest that it made more sense to have a professional look at it. Thankfully he was our friend, so it wasn't too costly.
Next, we had someone come and fix our main water shut off valve and the water spigot to the outside.
After all of that was done, Blake started on the insulation. When we picked up the insulation from the store Gavin asked why it smelled like cotton candy. We assured him, that it was all in his head.
Not only did it Not smell like cotton candy, it made Blake itch like it was nobodies business.
After all of that, we mostly feel a sense of accomplishment, and it isn't even done yet.
We decided a couple of weeks ago to also leave the drywall to a professional. We are nothing if not realists. We realize that our walls and ceilings have no texture and this is two big rooms. Our skills just don't compare to people that do it day in and day out.
They started doing the sheetrock today.
We are hoping that they will be done by the end of the week so that we can get to the good stuff.
We are putting in bamboo floors downstairs, that will match our upstairs wood floors.
I even did a preliminary lay out to see what they would look like.
Soon, very soon, it will be good bye carpet and hello wood. I also am a little giddy to have my house back to normal, or at least...new normal.

2 comments:

  1. I don't think that this is boring, at all! You guys had to make decisions, and seeing how it transpired would help other people who are into this, as well. That duct work you did by yourselves look great. You must have been quite proud of yourselves while feeling the cool breeze running through it. That means your HVAC system is up to speed. Good luck on your remaining tasks!